We deliver parametric Revit models to agreed Level of Development (LOD), sectioned deliverables (plans, elevations, schedules), model classification and property sets, IFC export for openBIM exchange. Typical deliverables includes: RVT packages, federated IFC(s), model validation report, element schedules along with the LOD matrix. (We work to LOD 100–500 mapping per project EIR).
We produce discipline-specific Revit MEP models with system routing, service zones, connection metadata and fabrication-level detailing when required (LOD 350–400). Our deliverables includes coordinated RVT models, clash reports (Navisworks), MEP shop drawings and IFC for contractors/MEP fabricators.
Custom parametric families (voids, shared parameters, connectors, performance metadata) with naming standards, type catalogs and parameter mapping to facility-management fields (to support AIM / maintenance). Families are tested for performance, nested properly and delivered with documentation and QA checks.
At QeCAD, we specialize in converting scanned or point cloud data into intelligent BIM models to the required LOD that reflect the as-built condition of your project. Our workflow ensures precision and quality. We also help with QA and deviation report (comparative analysis between scan data and BIM output if need be). Our services are idle for renovations, refurbishments, seismic upgrades and facility management in New Zealand ensuring models are reliable, consistent and ready for downstream use.
We federate multi-discipline models; run rule-based clash detection along with the priority tagging; generate and manage issues via BCF for traceable, model-linked workflows. We also run iterative coordination sprints and maintain a coordination log that maps clashes to its owners and the status until the sign-off.
We deliver final AIM export packages (IFC + RVT + structured property sets), COBie or client CSV handover (if requested), maintenance schedules and an AIM acceptance report. We ensure that the metadata aligns to Asset Information Requirements so the Facility Management teams can onboard the model immediately.


