{"id":648,"date":"2026-02-16T05:46:18","date_gmt":"2026-02-16T05:46:18","guid":{"rendered":"https:\/\/www.qecad.com.au\/blog\/?p=648"},"modified":"2026-02-16T13:05:04","modified_gmt":"2026-02-16T13:05:04","slug":"how-bim-prevents-costly-construction-documentation-errors","status":"publish","type":"post","link":"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/","title":{"rendered":"How BIM Prevents Costly Construction Documentation Errors?"},"content":{"rendered":"\n<p>Construction projects are complex ecosystems involving all the AEC professionals each contributing to a shared project objective. Yet, even minor <strong>errors in the construction documentation<\/strong> can trigger the costly delays, reworks and disputes that balloon project costs into the millions. In an industry driven by precision, the stakes are high \u2014 so why do these documentation failures happen and how does <strong>BIM<\/strong> prevents them?<\/p>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">The True Cost of Documentation Errors<\/span><\/strong><\/p>\n\n\n\n<p>Construction documentation underpins every stage of a project, guiding decisions from design through delivery. It includes the architectural plans, structural drawings, specifications, schedules and contracts \u2014 the blueprints upon which the execution is based. Mistakes or misinterpretations in any of these can lead to severe repercussions:<\/p>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">1. Rework and Change Orders<\/span><\/strong><\/p>\n\n\n\n<p>When documentation errors are discovered during the construction rather than in design review, the financial impact multiplies rapidly. Research shows that these late-stage errors can increase the direct costs by <strong>1.8\u20132.3 times<\/strong> compared to if they were caught earlier. <em>(Research Gate)<\/em><\/p>\n\n\n\n<p>Change orders \u2014 revisions to the contract scope \u2014 can often cost <strong>up to 10% or more of the contract value<\/strong> on poorly documented projects, further inflating the budgets and delaying the schedules. <em>(developers.dev)<\/em><\/p>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">2. Project Delays<\/span><\/strong><\/p>\n\n\n\n<p>Industry analysis indicates that <strong>over 50% of the project delays<\/strong> stems from poorly coordinated or ambiguous documentation. Every pause on the site \u2014 whether waiting for the clarification or tearing out incorrect work \u2014 translates into labour inefficiency and extended timelines. <em>(developers.dev)<\/em><\/p>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">3. Waste and Material Mismanagement<\/span><\/strong><\/p>\n\n\n\n<p>Incomplete or incorrect drawings causes wrong materials to be ordered, resulting in the wastage, storage challenges and inflated purchasing costs. Material wastes alone often contributes to the major budget overruns.<\/p>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">4. Legal and Contractual Risks<\/span><\/strong><\/p>\n\n\n\n<p>Documentation errors are cited as the primary basis for the disputes in about <strong>37% of arbitration cases<\/strong>, with typical dispute values around <strong>7.3% of the contract price<\/strong>. <em>(Research Gate)<\/em><\/p>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">Why Traditional Methods Still Fall Short?<\/span><\/strong><\/p>\n\n\n\n<p>Traditional workflows \u2014 reliant on 2D drawings, manual checks, siloed teams and paper-based revisions \u2014 are inherently prone to the human errors. Even with the advanced <strong><a href=\"https:\/\/www.qecad.com.au\/services\/construction-drawing-services.php\">Construction Drawing Services<\/a><\/strong> and <strong><a href=\"https:\/\/www.qecad.com.au\/services\/architectural-drafting-services.php\">Architectural Drafting Services<\/a><\/strong>, the manual translation of the design intent into buildable documentation opens the door to misinterpretation.<\/p>\n\n\n\n<p>For complex projects with thousands of drawings and frequent revisions, managing versions and ensuring the completeness without digital coordination is nearly impossible. Every redundant revision, poorly annotated detail or overlooked dimension becomes a potential budget line item.<\/p>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">How BIM Prevents Costly Documentation Errors?<\/span><\/strong><\/p>\n\n\n\n<p>BIM revolutionizes the documentation by converting the static drawings into a <strong>dynamic, data-rich digital model<\/strong> that unifies all disciplines.<\/p>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">1. Single Source of Truth<\/span><\/strong><\/p>\n\n\n\n<p>With BIM, architects, engineers and contractors all work on the same model in the real time. This eliminates the conflicting versions and ambiguity. Teams can instantly see updates across architectural, structural and MEP systems thus dramatically reducing the miscommunication.<\/p>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">2. Clash Detection Before Construction<\/span><\/strong><\/p>\n\n\n\n<p>Clash detection is one of the most powerful capabilities of BIM. Instead of discovering that the ductwork intersects with structural beams on site \u2014 a costly oversight \u2014 BIM flags these issues during the design. Studies shows that BIM can reduce the design errors by <strong>50\u201360%<\/strong> and clashes by <strong>40%<\/strong>, directly lowering the reworks and schedule impacts. <em>(Springer)<\/em><\/p>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">3. Integrated Planning and Cost Control<\/span><\/strong><\/p>\n\n\n\n<p>BIM\u2019s 4D and 5D capabilities integrates the time and cost data directly into the model. This allows the teams to simulate the construction sequencing and estimate the accurate budgets before the ground is broken, leading to fewer surprises and more predictable execution.<\/p>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">4. Reduced Rework and Waste<\/span><\/strong><\/p>\n\n\n\n<p>Automated quantity take-offs, precise geometry and accurate materials data helps to prevent the over-ordering and reduce the wastage. Documents extracted from a BIM model are synchronized thus ensuring that everyone right from the suppliers to the site teams \u2014 works from the same dataset.<\/p>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">5. Improved Collaboration and Communication<\/span><\/strong><\/p>\n\n\n\n<p>Cloud-based BIM platforms enables the stakeholders to communicate in the real time thus eliminating the delays caused by the outdated emails, PDFs or offline versions. Centralized documentation improves the accountability and drastically reduces the RFIs (Requests for Information), which are both costly and time-consuming.<\/p>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">Quantifiable Benefits of BIM Adoption<\/span><\/strong><\/p>\n\n\n\n<p>Here\u2019s how BIM transforms the risk into measurable value as per <em>Springer:<\/em><\/p>\n\n\n\n<ul>\n<li><strong>Design errors cut by up to 60%<\/strong> through the automated checks and coordination.<\/li>\n\n\n\n<li><strong>Rework costs drops by 40\u201350%<\/strong> due to early issue detection.<\/li>\n\n\n\n<li><strong>Clash occurrences reduced by around 40%<\/strong> before the construction begins.<\/li>\n\n\n\n<li><strong>Better cost control and schedule adherence<\/strong>, leading to savings at every stage.<\/li>\n<\/ul>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">Conclusion<\/span><\/strong><\/p>\n\n\n\n<p>In today\u2019s fast-paced construction environment, the documentation errors are not just the technical setbacks \u2014 they are the financial liabilities. From reworks and change orders to the legal disputes and material wastage, the cost of inaccuracies can easily escalate into the millions.<\/p>\n\n\n\n<p>BIM offers a proactive solution. By centralizing the data, enabling the real-time collaboration and integrating the design with the cost and time planning, BIM transforms the documentation work into a precision-controlled process. For developers, contractors and architects alike, adopting BIM isn\u2019t just a technological upgrade \u2014 it\u2019s a strategic necessity that protects budgets, timelines and reputations.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction projects are complex ecosystems involving all the AEC professionals each contributing to a shared project objective. Yet, even minor errors in the construction documentation can trigger the costly delays, reworks and disputes that balloon project costs into the millions. In an industry driven by precision, the stakes are high \u2014 so why do these [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":649,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[16,68,28,69],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How BIM Prevents Costly Construction Documentation Errors?<\/title>\n<meta name=\"description\" content=\"Discover how BIM reduces construction documentation errors through better coordination, automation, and data-driven accuracy.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How BIM Prevents Costly Construction Documentation Errors?\" \/>\n<meta property=\"og:description\" content=\"Discover how BIM reduces construction documentation errors through better coordination, automation, and data-driven accuracy.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/\" \/>\n<meta property=\"og:site_name\" content=\"QeCAD\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-16T05:46:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-16T13:05:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2026\/02\/How-BIM-Prevents-Costly-Construction-Documentation-Errors.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"dolly\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"dolly\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/\"},\"author\":{\"name\":\"dolly\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#\/schema\/person\/4009c70a586774806d6ce3804be23caf\"},\"headline\":\"How BIM Prevents Costly Construction Documentation Errors?\",\"datePublished\":\"2026-02-16T05:46:18+00:00\",\"dateModified\":\"2026-02-16T13:05:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/\"},\"wordCount\":822,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2026\/02\/How-BIM-Prevents-Costly-Construction-Documentation-Errors.jpg\",\"keywords\":[\"Architectural Drafting Services\",\"BIM for Construction Documentation\",\"BIM Services\",\"Construtcion Documentation Services\"],\"articleSection\":[\"BIM Modeling\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/\",\"url\":\"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/\",\"name\":\"How BIM Prevents Costly Construction Documentation Errors?\",\"isPartOf\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2026\/02\/How-BIM-Prevents-Costly-Construction-Documentation-Errors.jpg\",\"datePublished\":\"2026-02-16T05:46:18+00:00\",\"dateModified\":\"2026-02-16T13:05:04+00:00\",\"description\":\"Discover how BIM reduces construction documentation errors through better coordination, automation, and data-driven accuracy.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/#primaryimage\",\"url\":\"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2026\/02\/How-BIM-Prevents-Costly-Construction-Documentation-Errors.jpg\",\"contentUrl\":\"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2026\/02\/How-BIM-Prevents-Costly-Construction-Documentation-Errors.jpg\",\"width\":800,\"height\":500,\"caption\":\"How BIM Prevents Costly Construction Documentation Errors?\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.qecad.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How BIM Prevents Costly Construction Documentation Errors?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#website\",\"url\":\"https:\/\/www.qecad.com.au\/blog\/\",\"name\":\"QeCAD\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.qecad.com.au\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#organization\",\"name\":\"QeCAD Studio LLP\",\"url\":\"https:\/\/www.qecad.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2024\/03\/logo.png\",\"contentUrl\":\"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2024\/03\/logo.png\",\"width\":181,\"height\":90,\"caption\":\"QeCAD Studio LLP\"},\"image\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#\/schema\/person\/4009c70a586774806d6ce3804be23caf\",\"name\":\"dolly\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g\",\"caption\":\"dolly\"},\"url\":\"https:\/\/www.qecad.com.au\/blog\/author\/dolly\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How BIM Prevents Costly Construction Documentation Errors?","description":"Discover how BIM reduces construction documentation errors through better coordination, automation, and data-driven accuracy.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/","og_locale":"en_US","og_type":"article","og_title":"How BIM Prevents Costly Construction Documentation Errors?","og_description":"Discover how BIM reduces construction documentation errors through better coordination, automation, and data-driven accuracy.","og_url":"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/","og_site_name":"QeCAD","article_published_time":"2026-02-16T05:46:18+00:00","article_modified_time":"2026-02-16T13:05:04+00:00","og_image":[{"width":800,"height":500,"url":"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2026\/02\/How-BIM-Prevents-Costly-Construction-Documentation-Errors.jpg","type":"image\/jpeg"}],"author":"dolly","twitter_card":"summary_large_image","twitter_misc":{"Written by":"dolly","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/#article","isPartOf":{"@id":"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/"},"author":{"name":"dolly","@id":"https:\/\/www.qecad.com.au\/blog\/#\/schema\/person\/4009c70a586774806d6ce3804be23caf"},"headline":"How BIM Prevents Costly Construction Documentation Errors?","datePublished":"2026-02-16T05:46:18+00:00","dateModified":"2026-02-16T13:05:04+00:00","mainEntityOfPage":{"@id":"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/"},"wordCount":822,"commentCount":0,"publisher":{"@id":"https:\/\/www.qecad.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/#primaryimage"},"thumbnailUrl":"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2026\/02\/How-BIM-Prevents-Costly-Construction-Documentation-Errors.jpg","keywords":["Architectural Drafting Services","BIM for Construction Documentation","BIM Services","Construtcion Documentation Services"],"articleSection":["BIM Modeling"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/","url":"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/","name":"How BIM Prevents Costly Construction Documentation Errors?","isPartOf":{"@id":"https:\/\/www.qecad.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/#primaryimage"},"image":{"@id":"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/#primaryimage"},"thumbnailUrl":"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2026\/02\/How-BIM-Prevents-Costly-Construction-Documentation-Errors.jpg","datePublished":"2026-02-16T05:46:18+00:00","dateModified":"2026-02-16T13:05:04+00:00","description":"Discover how BIM reduces construction documentation errors through better coordination, automation, and data-driven accuracy.","breadcrumb":{"@id":"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/#primaryimage","url":"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2026\/02\/How-BIM-Prevents-Costly-Construction-Documentation-Errors.jpg","contentUrl":"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2026\/02\/How-BIM-Prevents-Costly-Construction-Documentation-Errors.jpg","width":800,"height":500,"caption":"How BIM Prevents Costly Construction Documentation Errors?"},{"@type":"BreadcrumbList","@id":"https:\/\/www.qecad.com.au\/blog\/how-bim-prevents-costly-construction-documentation-errors\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.qecad.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"How BIM Prevents Costly Construction Documentation Errors?"}]},{"@type":"WebSite","@id":"https:\/\/www.qecad.com.au\/blog\/#website","url":"https:\/\/www.qecad.com.au\/blog\/","name":"QeCAD","description":"","publisher":{"@id":"https:\/\/www.qecad.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.qecad.com.au\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.qecad.com.au\/blog\/#organization","name":"QeCAD Studio LLP","url":"https:\/\/www.qecad.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.qecad.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2024\/03\/logo.png","contentUrl":"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2024\/03\/logo.png","width":181,"height":90,"caption":"QeCAD Studio LLP"},"image":{"@id":"https:\/\/www.qecad.com.au\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.qecad.com.au\/blog\/#\/schema\/person\/4009c70a586774806d6ce3804be23caf","name":"dolly","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.qecad.com.au\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g","caption":"dolly"},"url":"https:\/\/www.qecad.com.au\/blog\/author\/dolly\/"}]}},"_links":{"self":[{"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/posts\/648"}],"collection":[{"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/comments?post=648"}],"version-history":[{"count":2,"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/posts\/648\/revisions"}],"predecessor-version":[{"id":653,"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/posts\/648\/revisions\/653"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/media\/649"}],"wp:attachment":[{"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/media?parent=648"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/categories?post=648"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/tags?post=648"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}