{"id":441,"date":"2025-03-26T05:45:45","date_gmt":"2025-03-26T05:45:45","guid":{"rendered":"https:\/\/www.qecad.com.au\/blog\/?p=441"},"modified":"2025-03-27T07:25:24","modified_gmt":"2025-03-27T07:25:24","slug":"how-to-improve-multi-disciplinary-coordination-on-shop-drawings","status":"publish","type":"post","link":"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/","title":{"rendered":"How to Improve Multi-Disciplinary Coordination on Shop Drawings?"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<p>Shop drawings play a crucial role in multi-disciplinary construction projects serving as the bridge between the design and the execution. Effective collaboration on these detailed technical drawings ensures the accuracy, efficiency and seamless coordination among various stakeholders including the architects, engineers, contractors as well as the fabricators. Here\u2019s how to optimize the collaboration on shop drawings to achieve the project success.<\/p>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">1. Establish Clear Communication Channels<\/span><\/strong><\/p>\n\n\n\n<p>The clear and structured communications are essential to avoid any misunderstandings as well as the reworks. Consider these best practices:<\/p>\n\n\n\n<ul>\n<li>Use a centralized communication platform like BIM 360, Procore or even the Autodesk Construction Cloud.<\/li>\n\n\n\n<li>Schedule regular meetings with the stakeholders to address any of the concerns and adhere with the expectations.<\/li>\n\n\n\n<li>Establish a standard protocol for RFIs (Requests for Information) to ensure the timely resolution of any of the queries.<\/li>\n<\/ul>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">2. Standardize Shop Drawing Formats and Guidelines<\/span><\/strong><\/p>\n\n\n\n<p>Consistency in formatting helps to streamline the review and approval processes. The standardization can be achieved by:<\/p>\n\n\n\n<ul>\n<li>Defining a common template with the title blocks, revision tracking as well as the standardized annotations.<\/li>\n\n\n\n<li>Establishing a clear layer and color-coding system for the different disciplines.<\/li>\n\n\n\n<li>Implementing the naming conventions for the drawings to maintain the organization and the version control.<\/li>\n<\/ul>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">3. Leverage BIM<\/span><\/strong><\/p>\n\n\n\n<p><strong><a href=\"https:\/\/www.qecad.com.au\/services\/bim-services.php\">BIM Coordination Services<\/a><\/strong> facilitates the seamless collaboration among the different disciplines through:<\/p>\n\n\n\n<ul>\n<li>A shared digital model that allows the real-time updates and conflict detection.<\/li>\n\n\n\n<li>Clash detection tools in BIM software like Navisworks or Revit to identify and resolve the possible conflicts before the fabrication.<\/li>\n\n\n\n<li>Cloud-based collaboration enabling the remote access as well as the simultaneous work by the multiple teams.<\/li>\n<\/ul>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">4. Foster Cross-Disciplinary Coordination<\/span><\/strong><\/p>\n\n\n\n<p>Multi-disciplinary projects involves various trades thereby making the coordination essential to prevent the design conflicts. Strategies includes:<\/p>\n\n\n\n<ul>\n<li>Conducting the interdisciplinary coordination meetings to discussthe&nbsp; integration challenges.<\/li>\n\n\n\n<li>Using federated models where the architectural, structural and even the MEP (Mechanical, Electrical, Plumbing) elements are reviewed together.<\/li>\n\n\n\n<li>Encouraging the early engagement of all the stakeholders to identify and resolve the potential conflicts.<\/li>\n<\/ul>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">5. Implement a Robust Review and Approval Workflow<\/span><\/strong><\/p>\n\n\n\n<p>A systematic review process ensures that the shop drawings meets the project requirements. The key steps includes:<\/p>\n\n\n\n<ul>\n<li>Assigning a dedicated reviewer for each discipline to check the compliance and the accuracy.<\/li>\n\n\n\n<li>Establishing a clear approval hierarchy to streamline the submission process.<\/li>\n\n\n\n<li>Utilizing the digital markup tools in the platforms like Bluebeam or PlanGrid for the efficient commenting as well as the revisions.<\/li>\n<\/ul>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">6. Minimize Errors Through Version Control<\/span><\/strong><\/p>\n\n\n\n<p>Managing multiple drawing versions can be challenging. To avoid confusion:<\/p>\n\n\n\n<ul>\n<li>Use cloud storage solutions with automatic versioning such as Dropbox, OneDrive or SharePoint.<\/li>\n\n\n\n<li>Clearly label the drawing versions with the timestamps and the revision history.<\/li>\n\n\n\n<li>Restrict the access to the final approved drawings to prevent any of the outdated versions from being used on-site.<\/li>\n<\/ul>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">7. Encourage Collaboration Between Designers and Contractors<\/span><\/strong><\/p>\n\n\n\n<p>To connect design intent with practical constructability:<\/p>\n\n\n\n<ul>\n<li>Involve the contractors and the fabricators early in the design review process.<\/li>\n\n\n\n<li>Foster open discussions to incorporate the practical insights from the field experts.<\/li>\n\n\n\n<li>Implement the value engineering strategies to optimize the materials and the methods without compromising the design intent.<\/li>\n<\/ul>\n\n\n\n<p><strong><a href=\"https:\/\/www.qecad.com.au\/services\/shop-drawing-services.php\">Shop Drawing Services<\/a> <\/strong>typically follow established protocols to ensure smooth coordination among various teams.<\/p>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">8. Document Lessons Learned for Future Projects<\/span><\/strong><\/p>\n\n\n\n<p>The post-project evaluation enhances the future collaborations by:<\/p>\n\n\n\n<ul>\n<li>Conducting the debrief meetings to discuss the challenges along with the improvements.<\/li>\n\n\n\n<li>Creating the best practices guide based on the past experiences.<\/li>\n\n\n\n<li>Updating the standard procedures as well as the checklists to improve the efficiency in the subsequent projects.<\/li>\n<\/ul>\n\n\n\n<p><strong><span style=\"text-decoration: underline\">Conclusion<\/span><\/strong><\/p>\n\n\n\n<p>The successful collaboration on the shop drawings in the multi-disciplinary projects requires the structured communication, standardized processes and the effective use of the technology.<\/p>\n\n\n\n<p>By fostering the cross-team coordination, implementing the BIM and also ensuring the robust review mechanisms, the stakeholders can achieve the seamless execution, reduce the errors and even enhance the overall project efficiency.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Shop drawings play a crucial role in multi-disciplinary construction projects serving as the bridge between the design and the execution. Effective collaboration on these detailed technical drawings ensures the accuracy, efficiency and seamless coordination among various stakeholders including the architects, engineers, contractors as well as the fabricators. Here\u2019s how to optimize the collaboration on shop [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":442,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[36,29,28,19],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How to Improve Multi-Disciplinary Coordination on Shop Drawings?<\/title>\n<meta name=\"description\" content=\"Learn how to enhance multi-disciplinary coordination on shop drawings for improved accuracy, efficiency, and project success.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Improve Multi-Disciplinary Coordination on Shop Drawings?\" \/>\n<meta property=\"og:description\" content=\"Learn how to enhance multi-disciplinary coordination on shop drawings for improved accuracy, efficiency, and project success.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/\" \/>\n<meta property=\"og:site_name\" content=\"QeCAD\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-26T05:45:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-03-27T07:25:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2025\/03\/Shop-Drawings-Coordination.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2280\" \/>\n\t<meta property=\"og:image:height\" content=\"1425\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"dolly\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"dolly\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/\"},\"author\":{\"name\":\"dolly\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#\/schema\/person\/4009c70a586774806d6ce3804be23caf\"},\"headline\":\"How to Improve Multi-Disciplinary Coordination on Shop Drawings?\",\"datePublished\":\"2025-03-26T05:45:45+00:00\",\"dateModified\":\"2025-03-27T07:25:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/\"},\"wordCount\":640,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2025\/03\/Shop-Drawings-Coordination.jpeg\",\"keywords\":[\"BIM Coordination\",\"BIM MOdeling\",\"BIM Services\",\"Shop Drawing Services\"],\"articleSection\":[\"Shop Drawings\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/\",\"url\":\"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/\",\"name\":\"How to Improve Multi-Disciplinary Coordination on Shop Drawings?\",\"isPartOf\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2025\/03\/Shop-Drawings-Coordination.jpeg\",\"datePublished\":\"2025-03-26T05:45:45+00:00\",\"dateModified\":\"2025-03-27T07:25:24+00:00\",\"description\":\"Learn how to enhance multi-disciplinary coordination on shop drawings for improved accuracy, efficiency, and project success.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/#primaryimage\",\"url\":\"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2025\/03\/Shop-Drawings-Coordination.jpeg\",\"contentUrl\":\"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2025\/03\/Shop-Drawings-Coordination.jpeg\",\"width\":2280,\"height\":1425,\"caption\":\"How to Improve Multi-Disciplinary Coordination on Shop Drawings?\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.qecad.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Improve Multi-Disciplinary Coordination on Shop Drawings?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#website\",\"url\":\"https:\/\/www.qecad.com.au\/blog\/\",\"name\":\"QeCAD\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.qecad.com.au\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#organization\",\"name\":\"QeCAD Studio LLP\",\"url\":\"https:\/\/www.qecad.com.au\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2024\/03\/logo.png\",\"contentUrl\":\"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2024\/03\/logo.png\",\"width\":181,\"height\":90,\"caption\":\"QeCAD Studio LLP\"},\"image\":{\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#\/schema\/person\/4009c70a586774806d6ce3804be23caf\",\"name\":\"dolly\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.qecad.com.au\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g\",\"caption\":\"dolly\"},\"url\":\"https:\/\/www.qecad.com.au\/blog\/author\/dolly\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to Improve Multi-Disciplinary Coordination on Shop Drawings?","description":"Learn how to enhance multi-disciplinary coordination on shop drawings for improved accuracy, efficiency, and project success.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/","og_locale":"en_US","og_type":"article","og_title":"How to Improve Multi-Disciplinary Coordination on Shop Drawings?","og_description":"Learn how to enhance multi-disciplinary coordination on shop drawings for improved accuracy, efficiency, and project success.","og_url":"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/","og_site_name":"QeCAD","article_published_time":"2025-03-26T05:45:45+00:00","article_modified_time":"2025-03-27T07:25:24+00:00","og_image":[{"width":2280,"height":1425,"url":"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2025\/03\/Shop-Drawings-Coordination.jpeg","type":"image\/jpeg"}],"author":"dolly","twitter_card":"summary_large_image","twitter_misc":{"Written by":"dolly","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/#article","isPartOf":{"@id":"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/"},"author":{"name":"dolly","@id":"https:\/\/www.qecad.com.au\/blog\/#\/schema\/person\/4009c70a586774806d6ce3804be23caf"},"headline":"How to Improve Multi-Disciplinary Coordination on Shop Drawings?","datePublished":"2025-03-26T05:45:45+00:00","dateModified":"2025-03-27T07:25:24+00:00","mainEntityOfPage":{"@id":"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/"},"wordCount":640,"commentCount":0,"publisher":{"@id":"https:\/\/www.qecad.com.au\/blog\/#organization"},"image":{"@id":"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/#primaryimage"},"thumbnailUrl":"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2025\/03\/Shop-Drawings-Coordination.jpeg","keywords":["BIM Coordination","BIM MOdeling","BIM Services","Shop Drawing Services"],"articleSection":["Shop Drawings"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/","url":"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/","name":"How to Improve Multi-Disciplinary Coordination on Shop Drawings?","isPartOf":{"@id":"https:\/\/www.qecad.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/#primaryimage"},"image":{"@id":"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/#primaryimage"},"thumbnailUrl":"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2025\/03\/Shop-Drawings-Coordination.jpeg","datePublished":"2025-03-26T05:45:45+00:00","dateModified":"2025-03-27T07:25:24+00:00","description":"Learn how to enhance multi-disciplinary coordination on shop drawings for improved accuracy, efficiency, and project success.","breadcrumb":{"@id":"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/#primaryimage","url":"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2025\/03\/Shop-Drawings-Coordination.jpeg","contentUrl":"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2025\/03\/Shop-Drawings-Coordination.jpeg","width":2280,"height":1425,"caption":"How to Improve Multi-Disciplinary Coordination on Shop Drawings?"},{"@type":"BreadcrumbList","@id":"https:\/\/www.qecad.com.au\/blog\/how-to-improve-multi-disciplinary-coordination-on-shop-drawings\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.qecad.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"How to Improve Multi-Disciplinary Coordination on Shop Drawings?"}]},{"@type":"WebSite","@id":"https:\/\/www.qecad.com.au\/blog\/#website","url":"https:\/\/www.qecad.com.au\/blog\/","name":"QeCAD","description":"","publisher":{"@id":"https:\/\/www.qecad.com.au\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.qecad.com.au\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.qecad.com.au\/blog\/#organization","name":"QeCAD Studio LLP","url":"https:\/\/www.qecad.com.au\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.qecad.com.au\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2024\/03\/logo.png","contentUrl":"https:\/\/www.qecad.com.au\/blog\/wp-content\/uploads\/2024\/03\/logo.png","width":181,"height":90,"caption":"QeCAD Studio LLP"},"image":{"@id":"https:\/\/www.qecad.com.au\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.qecad.com.au\/blog\/#\/schema\/person\/4009c70a586774806d6ce3804be23caf","name":"dolly","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.qecad.com.au\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g","caption":"dolly"},"url":"https:\/\/www.qecad.com.au\/blog\/author\/dolly\/"}]}},"_links":{"self":[{"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/posts\/441"}],"collection":[{"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/comments?post=441"}],"version-history":[{"count":2,"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/posts\/441\/revisions"}],"predecessor-version":[{"id":446,"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/posts\/441\/revisions\/446"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/media\/442"}],"wp:attachment":[{"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/media?parent=441"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/categories?post=441"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.qecad.com.au\/blog\/wp-json\/wp\/v2\/tags?post=441"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}